Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 16 results ...

Carpenter, N and Bausman, D C (2016) Project Delivery Method Performance for Public School Construction: Design-Bid-Build versus CM at Risk. Journal of Construction Engineering and Management, 142(10).

Chang, C and Chen, S (2016) Transitional Public–Private Partnership Model in China: Contracting with Little Recourse to Contracts. Journal of Construction Engineering and Management, 142(10).

Chen, C, Wang, Q, Martek, I and Li, H (2016) International Market Selection Model for Large Chinese Contractors. Journal of Construction Engineering and Management, 142(10).

Choi, J O, O’Connor, J T and Kim, T W (2016) Recipes for Cost and Schedule Successes in Industrial Modular Projects: Qualitative Comparative Analysis. Journal of Construction Engineering and Management, 142(10).

  • Type: Journal Article
  • Keywords: Modularization; Critical success factors; Industrial projects; Cost performance; Schedule performance; Project planning and design;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0001171
  • Abstract:
    Modularization is a well-established method that can improve the efficiency and effectiveness of the construction industry. However, the industry continues to struggle with its implementation, and not all executed modular projects have resulted in successful project performance. This study investigates the combinatorial effects of modularization critical success factors (CSF) on the cost and schedule performances of industrial modular projects and derives a conceptual model of cost and schedule successes using information from actual cases by applying crisp-set qualitative comparative analysis. The findings confirm that CSFs interactively and collectively affect modular industrial project performance. The most commonly involved CSFs for cost and schedule successes are timely design freeze, owner-furnished/long-lead equipment specification, vendor involvement, and management of execution risks. This work contributes to researchers and practitioners in the industrial sector to improve understanding of the recipes (i.e., CSFs or combinations thereof) for successful modular project planning and execution, which will lead to improved modular project performance in the construction industry.

Choi, K and Lee, H W (2016) Deconstructing the Construction Industry: A Spatiotemporal Clustering Approach to Profitability Modeling. Journal of Construction Engineering and Management, 142(10).

de Castro e Silva Neto, D, Cruz, C O, Rodrigues, F and Silva, P (2016) Bibliometric Analysis of PPP and PFI Literature: Overview of 25 Years of Research. Journal of Construction Engineering and Management, 142(10).

Duzkale, A K and Lucko, G (2016) Exposing Uncertainty in Bid Preparation of Steel Construction Cost Estimating: I. Conceptual Framework and Qualitative C-I-V-I-L Classification. Journal of Construction Engineering and Management, 142(10).

Duzkale, A K and Lucko, G (2016) Exposing Uncertainty in Bid Preparation of Steel Construction Cost Estimating: II. Comparative Analysis and Quantitative C-I-V-I-L Classification. Journal of Construction Engineering and Management, 142(10).

Gwak, H, Son, S, Park, Y and Lee, D (2016) Exact Time–Cost Tradeoff Analysis in Concurrency-Based Scheduling. Journal of Construction Engineering and Management, 142(10).

Harper, C M, Molenaar, K R and Cannon, J P (2016) Measuring Constructs of Relational Contracting in Construction Projects: The Owner’s Perspective. Journal of Construction Engineering and Management, 142(10).

Moret, Y and Einstein, H H (2016) Construction Cost and Duration Uncertainty Model: Application to High-Speed Rail Line Project. Journal of Construction Engineering and Management, 142(10).

Namian, M, Albert, A, Zuluaga, C M and Jaselskis, E J (2016) Improving Hazard-Recognition Performance and Safety Training Outcomes: Integrating Strategies for Training Transfer. Journal of Construction Engineering and Management, 142(10).

Poshdar, M, González, V A, Raftery, G M, Orozco, F, Romeo, J S and Forcael, E (2016) A Probabilistic-Based Method to Determine Optimum Size of Project Buffer in Construction Schedules. Journal of Construction Engineering and Management, 142(10).

Ramaji, I J and Memari, A M (2016) Product Architecture Model for Multistory Modular Buildings. Journal of Construction Engineering and Management, 142(10).

Salas, R and Hallowell, M (2016) Predictive Validity of Safety Leading Indicators: Empirical Assessment in the Oil and Gas Sector. Journal of Construction Engineering and Management, 142(10).

Sveikauskas, L, Rowe, S, Mildenberger, J, Price, J and Young, A (2016) Productivity Growth in Construction. Journal of Construction Engineering and Management, 142(10).